Infrastructure
Infrastructure Program Services
- Site Inspection: This process begins at Tribal Realty and is sent through the approval process to identify a buildable house site and road access.
- House Lot Survey: Surveying requests for approved buildable house sites.
- Site Prep: House site grading and driveway will be constructed on a buildable house site.
- Hydroseeding: To help prevent erosion, hydroseeding will be done once site prep is complete.
- Block Foundation: The foundation will be built for modular homes and stick built homes.
- Termite Spray: This treatment is for block foundations for new homes.
- Concrete Footers: Footers will be poured for single and doublewide mobile homes.
- Block Underpinning: Block underpinning will be installed for doublewides.
- Vinyl Underpinning: K-rock vinyl underpinning will be installed on single wide trailers.
- Trailer Transports: Mobile home transports from trust land locations to be set up as permanent residence for enrolled members. We do not transport mobile homes from a mobile home company due the warranty on the home and liability.
- Gutters: Gutter install is provided for new homes if needed, such as modulars, stick built and doublewides. We do not install gutters on singlewides. Gutter repair is done if they are causing erosion problems.
- Final Grade: Drain lines are installed and the yard is graded to give positive drainage away from the foundation to prevent erosion.
- Asbestos Assessment: This assessment is performed on any home on trust lands owned by EBCI members and is being fully remodeled or demoed.
- Asbestos Abatement: The abatement is performed on any home that is positive for asbestos. The analysis is sent to Environmental, TCP and to the Land Fill for EBCI members replacing the old home with a new home as their permanent residence.
